Yılmaz WPP

İzmir, Türkiye

Yılmaz WPP, located in Menemen district of İzmir province, has an installed capacity of 15 MWm/12,5 MWe. A total of 4 Siemens Gamesa SG 132 - 3,75 MW wind turbines were deployed in the project.

The plant has reached commercial operation as of December 2020. Yılmaz WPP generates 47.300.000 kWh/year renewable energy where it meets the electricity needs of approximately 30.000 households annually.

Çapar Elektrik Üretim A.Ş.
Lamartin Cad. Ofis Lamartin No:5 Kat:5
Kocatepe Mah. 34437 Beyoğlu / İstanbul
Beyoğlu V.D. : 2300879596
MERSIS : 0230-0879-5960-0001

Details

15 MW

Installed Capacity

47.300 MWh

Annual Production

31.000 ton CO2

Carbon Emissions Avoided Annually

30.000

Households’ Annual Consumption