Yılmaz WPP, located in Menemen district of İzmir province, has an installed capacity of 15 MWm/12,5 MWe. A total of 4 Siemens Gamesa SG 132 - 3,75 MW wind turbines were deployed in the project.
The plant has reached commercial operation as of December 2020. Yılmaz WPP generates 47.300.000 kWh/year renewable energy where it meets the electricity needs of approximately 30.000 households annually.
Çapar Elektrik Üretim A.Ş.
Harbiye Mh. Cumhuriyet Cd.
Elmadağ İşhanı Apt. No:32 Kat:3 Şişli
Beyoğlu V.D. : 2300879596
MERSIS : 0230-0879-5960-0001